本网站使用浏览器纪录(Cookies)来提供您最好的使用体验,相关资讯请访问我们的隐私政策。如果您选择继续浏览或关闭这个提示,便表示您已接受我们的网站使用条款。 关闭

Carbon Steel Tee

2016/02/22
  • LINE
  • X
  • LinkedIn

Product forged steel equal tee
Size range 1/2"-24" are made by seamless pipes, above up to 72" are made by welded pipes
Thickness SCH20 SCH40 STD SCH60 SCHXS SCH80 SCH160 SCHXXS etc are available
Standards ASTMA234,ASTM A420,ANSI B16.9/B16.28/B16.25,ASME B16.9,
JIS B2311-1997/2312, JIS B2311/B2312, DIN 2605-1/2617/2615,
GB 12459—99,EN Standard etc.
Materials stainless steel, carbon steel, alloy steel
Stainless steel(ASTM A403 WP304,304L,316,316L,321. 1Cr18Ni9Ti, 00Cr19Ni10,00Cr17Ni14Mo2, ect)
Carbon steel(ASTM A234WPB,,A234WPC,A420WPL6. 20#,Q235,10#,20#,A3, Q235A, 20G,16Mn, ect)
Alloy steel(ASTM A234 WP12,WP11,WP22,WP5,WP9,WP91,16MnR, Cr5Mo, 12Cr1MoV, 10CrMo910,15CrMo, 12Cr2Mo1, ect)
Connection But welding,socket welding,threaded
Surface stainless steel: Polishing, Sand-blasting
carbon steel/alloy steel:
Black painting,varnish paint, anti rust oil, hot galvanized, cold galvanized, 3PE,etc
Application Petroleum, chemical, power, gas, metallurgy, shipbuilding, construction, etc
Package Plastic film, wooden cases ,wooden pallet, or according to customers' request
Certificate API, and ISO9001:2000 Certificates,CE,BV, etc.
Capacity 50000tons/year
Advantages 1.Reasonable price with excellent quality
2.Abundant stock and prompt delivery
3.Rich supply and export experience, sincere service
4. Reliable forwarder
Port of loading Xingang (Tianjin) port
Payment Terms 30% down payment, the balance 70% T/T before the shipment Or L/C at sight.
Delivery Time 7-30 days, according to the order quantity.

为您推荐

浏览记录
    询价清单